Probably not an arc flash study. The NEC is an installation standard, not a safety standard. Arc Flash requirements are in NFPA 70E. 70E is enforceable only if adopted by some gov agency. If you are under OSHA, it applies.
But the NEC requires arc flash hazard labels, see 110.16