When performing an arc flash study for a facility/service, does/should the study consider the line side of the main OCPD? I would assume the answer is yes - even if worked de-energized a verification that line is dead would be required. I assume this means the arc flash study relies upon overcurrent device clearing times from the utility - is that a value that the utility would normally provide, if asked, in addition to available short ckt info? For reference the example would be 480V service, 2000 - 3000A.