I have a retail center, under single management, with parking lot lighting, wall sconces, signs, etc. When the lot was roughed in, the conduit for the lot lighting was run into one of the stores. I now have a house panel on the exterior of the store and want to extend that conduit and conductors to the house panel. Also, the wall sconces on that store are run to the store's panel. I want to also extend those to the house panel by splicing them in a box in the store.
Am I compliant with 225.30(D) ? The conductors will technically run through the store from an outside source but won't terminate in the store or serve anything in the store.