What's the deal with 680.26 ,C, 3? This new requirement for the bonding grid is unreal!
I have been a poolbuilder in the past. We installed fiberglass pools, and this bonding grid of copper is going to be a nightmare.
I realize that the pool builder on concrete pools has to bond his structural steel, and most of the builders up here do all of the bonding and get the inspection so that they can pour decking. If the pool is a descent size it could take a couple guys all day to lay out and tie this grid together. Not to mention the $$ in copper.
Is there any GOOD reason this was added?
I have been a poolbuilder in the past. We installed fiberglass pools, and this bonding grid of copper is going to be a nightmare.
I realize that the pool builder on concrete pools has to bond his structural steel, and most of the builders up here do all of the bonding and get the inspection so that they can pour decking. If the pool is a descent size it could take a couple guys all day to lay out and tie this grid together. Not to mention the $$ in copper.
Is there any GOOD reason this was added?