When attaching the pool shell to the perimeter bond at 4 points {680.26(B)(2)} it has always been required to use stainless fasteners (bolts, nuts, etc) to secure any lugs.
I was asked where the "no corrosive" requirement is located in the Code and can't put my finger on the specific wording. Any help ?
 

shortcircuit2

Senior Member
Location
South of Bawstin
When attaching the pool shell to the perimeter bond at 4 points {680.26(B)(2)} it has always been required to use stainless fasteners (bolts, nuts, etc) to secure any lugs.
I was asked where the "no corrosive" requirement is located in the Code and can't put my finger on the specific wording. Any help ?
In the 2023 Code the teminals are in 680.7(C)
Equipment is in 110.7
Then 110.2 approval
 