My employer has a large commercial property with several buildings and just had a, less than 3000 sq ft, temporary structure built (5 trailers fastened together). Two 208/120v 3p 4w w/g feeders were installed from a nearby bldg and both are supplied from breakers in the same panel. Feeder A terminates in a MBP, feeder B terminates in an ATS and both are mounted on the outside of the new structure. An outdoor generator provides the auxiliary power to the ATS, and the ATS feeds a MBP that’s also mounted on the outside of the new structure.
Is feeder B article 225.30(A)(2) Emergency system’s additional feeder that is permitted?
Is feeder B article 225.30(A)(2) Emergency system’s additional feeder that is permitted?