Dale001289
Senior Member
- Location
- Georgia
250.4(A) (1) thru (5) require equipment to be grounded/bonded in order to form an effective fault path. NEC also requires all grounding electrodes must be bonded together at the point of Service.
As standard industry practice we frequently bond metal surfaces such as panelboards, junction boxes, motor frames etc to the electrode system to eliminate differences of potential but where does it actually state in the Code this is a requirement?
As standard industry practice we frequently bond metal surfaces such as panelboards, junction boxes, motor frames etc to the electrode system to eliminate differences of potential but where does it actually state in the Code this is a requirement?