I have a contractor who is refusing to comply with 406.5(D) because the installation is in a wet location and they say only 406.9 applies, not 406.5.
I would interpret 406.5 and 406.9 to not be mutually exclusive and the requirements of 406.9 to be in addition to the requirements of 406.5, not in place of.
Anyone have any thoughts or advice on this?
I would interpret 406.5 and 406.9 to not be mutually exclusive and the requirements of 406.9 to be in addition to the requirements of 406.5, not in place of.