dhillerud@bepc.com
I have a question concerning installing
a TEFC motor in a Class 1 Div. II groups C&D
location. It is a 3C/w gnd cable installed in
cable tray going from the Class 1 Div II location
to a non - hazardous location.There is conduit from the tray to motor. Do I need a seal-off installed at the motor location?