Will be installing conduit from natural gas dispensing pumps (which are class1 - div1 locations) to a 1600AMP 480V Main distribution board that is NEMA 3R and will sit outside in free air in an unclassified area. If I understand correctly at least 1 additional seal would be required when I come up from underground directly into the bottom of the MDP. Where can I put this seal where it will be accessable for inspection? Am I interpreting this correctly?
Hoping someone can shed some light before I visit with the UL inspector.