Can anyone tell me when it was first required (in the NEC) that the branches of the essential electrical system by separated from each other? I think it was 1999 but I don't have a copy of anything older than 2005. I have had several clients get frustrated when I tell them that to add a receptacle to the emergency system will require a complete rework of at least part of the there electrical system to get L&I approval.
Thanks,
Wes
Thanks,
Wes