When rebuilding the service (new meter socket and transfer switch) at an active dairy farm would you expect to see overcurrent protection added for the existing underground feeds? This farm has an overhead triplex to the house and underground 3wire to the dairy barn and 2 other buildings. The transfer switch is a Rink with an off position.