Does the text change in 700.9(B)(5) allow me to add optional standby emergency circuits to a conduit containing emergency circuits? Both systems originate from the same generator. Conduit fill is not an issue. Engineer was not aware of the change; consequently was unsure. Thanks for any thoughts posted.