Hello to all- In regards to the 2008 NEC, Article 702.5 (2) (a)
It says: The standby source shall be capable of supplying the full load that is transferred by the automatic transfer equipment.
I welcome all answers but I am particularly interested in answers from inspectors. Does this mean that a residential standby generator with a automatic transfer switch must be capable of supplying all load connected at one time?
:?
It says: The standby source shall be capable of supplying the full load that is transferred by the automatic transfer equipment.