thanks, are you referring to the raceway as the conduit or enclosure? Let me explain it a little better. There is a combo meter with breaker. The feed from the breaker in the combo meter goes to the main breaker of the panel. Is it permissible to install a (2) separate conduits; (1) for ATS for normal power and (1) from the ATS for the panel as the load side and utilize the combo enclosure as a pass through?