Is it permissible to have an ATS energized as follows?
Normal feed is to be connected to the utility service (w/o standby emergency power) energizing building in which load is located.
Emergency feed is to be connected to the standby emergency generator utilized to back-up an adjacent building which is served by a separate utility service.
Both buildings are separately metered, but owned by one entity.
If permissible, are there any special requirements, such as, tagging, etc, required?
Reference to the Code sections would be appreciated.
Thank you
Normal feed is to be connected to the utility service (w/o standby emergency power) energizing building in which load is located.
Emergency feed is to be connected to the standby emergency generator utilized to back-up an adjacent building which is served by a separate utility service.
Both buildings are separately metered, but owned by one entity.
If permissible, are there any special requirements, such as, tagging, etc, required?
Reference to the Code sections would be appreciated.
Thank you