Trying to answer some bidding questions for my home work assingment and I have no experince with this at all could someone give me a hand. I cant seem to find an answere to theese 2 questions.
12. You?re figuring out the bid for a job that includes installing a device you?ve never installed
before. To get an accurate and competitive bid for this installation, you should
A. assume it won?t take more than the normal labor-unit so your bid won?t be more
than your competitor?s.
B. include the total cost of all tools needed to install it.
C. leave it out of the bid because you?re not sure exactly what it will cost to do the
installation.
D. try to guess at the time and expenses to install it based on your knowledge of
similar tasks.
13. When developing a bid for wiring a new building that contains 17 floors with the same
basic wiring layout, you need to
A. add 7% to the total project cost of labor.
B. subtract 7% from the cost of labor for each floor.
C. add 17% to the total project cost of labor.
D. subtract 17% from the cost of labor for each floor.
12. You?re figuring out the bid for a job that includes installing a device you?ve never installed
before. To get an accurate and competitive bid for this installation, you should
A. assume it won?t take more than the normal labor-unit so your bid won?t be more
than your competitor?s.
B. include the total cost of all tools needed to install it.
C. leave it out of the bid because you?re not sure exactly what it will cost to do the
installation.
D. try to guess at the time and expenses to install it based on your knowledge of
similar tasks.
13. When developing a bid for wiring a new building that contains 17 floors with the same
basic wiring layout, you need to
A. add 7% to the total project cost of labor.
B. subtract 7% from the cost of labor for each floor.
C. add 17% to the total project cost of labor.
D. subtract 17% from the cost of labor for each floor.