I'm bidding my first job and it's a basement finish. The basemant is 900 sq. feet with 12 cans and a ceiling fan in the bedroom. My take- off shows 39 wall openings and 14 ceiling openings, and 2 phones and tv's. I figure there's a day of disconnecting the old lights and the usual stuff. I bid it at $2,500 for the rough end and $550 for the trim. Too high/low?