I am running LFMC to some motors. We ran EMT to the unit from the VFD's. From the unit, we set a 4 sq box with LFMC stubbed out of the back of the box, through the wall of the unit, to the pecker head.
Now my question. At the pecker head, do I need a bond bushing to bond the LFMC?? We are also using reducing washers from 1"to 3/4" and 1" to 1/2".
Is 350.60 where I need to look??