greenspark1
Senior Member
- Location
- New England
Hi all. The situation is that we have a large office building with the switchgear 300' away from the domestic water entrance. The building is metal framed. Can we use the structural members to bond the metallic water piping instead of running a conductor all the way from switchgear to water entrance? I'm envisioning bonding the water piping to structure and the switchgear to structure? I can't quite tell from NEC 250. Thanks for any insight.