I was wondering if anyone had run into a similar situation? I am running a #8 solid ground around the contour of an above ground pool that is sitting on a concrete pad. With the pool sitting on the pad their is only a 10" lip of concrete around it except for a 10ft wide concrete walkway up to the pool the concrete was existing so the rebar was not bonded. How do you finish the bonding ring? I know saw cutting the concrete would be one way but if I could get around not doing that it would be preferred.