I’m working in a Class 2 Div 2 area and running RMC to end devices. Motor, switches, etc. I’m am using LFNC and installing an internal EGC to all devices. I have fittings and sealtite listed for Class 2 Div 1&2 area. Question: Does the code require me to have an external bonding jumper around the nonmetallic flex?