TwistedGrunt
New member
I have a very poor set of drawings that show the following conductors bonded inside the Service Enterance Panel; Ufer ground, ground rod, lightning protection counterpoise; comm room ground bar; cold water pipe; and building steel. I want to connect each of these conductors to a wall mounted ground bar near the panel, then run a bonding jumper to the grounding point in the Service Enterance Panel from the ground bar.
Is this proper?
Twisted Grunt
Is this proper?
Twisted Grunt