A friend has a 2"stub of schedule 80 pvc that comes out of the ground under a modular home. The manufacture has provided a 2"pvc stub out of the bottom of the new panel. They don't line up perfectly. What do you think? Pvc male connector, rigid coupling, flex connector, flex, and then the same thing all over? Or maybe a FA pvc connector and then a flex connector. I have been trying to find the code reference that states that you dont have to bond metallic conduit if its for a feeder coming out of the ground. I thought it was in article 300 but I can't find it. Any help or better suggestions would be great!