Isaiah
Senior Member
- Location
- Baton Rouge
- Occupation
- Electrical Inspector
Is there anything in the Code that requires
an exterior bonding jumper across LFMC greater than 6’ in length?
Sent from my iPhone using Tapatalk
an exterior bonding jumper across LFMC greater than 6’ in length?
Sent from my iPhone using Tapatalk