joshtrevino
Member
- Location
- Beaumont, TX
Does a bolted connection on a structure create an NEC acceptable bond between the two pieces of the structure bolted together? The structure in question is steel (may be galvanized).
Also, is it required to install a bonding jumper at each joint of a cable tray?
Any code references would be appreciated.
Also, is it required to install a bonding jumper at each joint of a cable tray?
Any code references would be appreciated.