I'm installing a 200Amp service in a residence in a location where the utility places the meter bases near the underground fed transformer. I'll run 4/0 4/0 2/0 USE AL in PVC a distance of about 200 feet. Does the code now require a bond to be run along with the service conductors? It is all underground and I don't remember having to do this in the past.