Gerry de Pedro
Member
Do equipment grounding system Medium Voltage( 11 KV) and LV ( 415/230) Have to be separated or just ground electrodes has to be bonded? How about the drain shield of MV Cable, does it have to be bonded to equipment ground at one end only?