I am installing a 1600A. backfeed system connecting to the buss of an existing 1600A. protected MDP. RGS (Rigid Galv. Steel) will be installed from the MDP to a pull box connected by weatherproof gasketed hubs, then to the new enclosed breaker. This is for a temp Generator to be connected. I know I need grounding bushings on both sides, but do i need a means of bonding inside the pullbox? Thanks