Hi. I’ve installed an exterior main breaker For a single phase residential several times and can’t remember what I did for bonding the rigid nipple coming out of the bottom of the meter to the Myers hub on top of the main breaker enclosure.
I do remember once running conduit to the basement main breaker panel and installing a grounding bushing in the meter pan and the utility co wanted it removed (I think I remember).
Is the Myers hub on the exterior disconnect considered as an approved bonding technique?
I’m asking as Jersey just adopted the 2020 NEC
Thank you
I do remember once running conduit to the basement main breaker panel and installing a grounding bushing in the meter pan and the utility co wanted it removed (I think I remember).
Is the Myers hub on the exterior disconnect considered as an approved bonding technique?
I’m asking as Jersey just adopted the 2020 NEC
Thank you