Is the ground bus in a service entrance switchboard or a panelboard downstream of a seperately derived system required to be bonded to the enclosure casing? I have always referred to this as an equipment bonding jumper, yet I can not specifically locate this requirement in the code. Is it required? What is the correct name of this bond, and how shall it be sized?