my question is this.
i have an outdoor subpanel feeding a submersible pump, the raceway leaving the subpanel is 1" schedule 40 pvc which stops at a pvc pullbox then continues from there to the pump in 1" IMC my coworker says the imc does not have to be bonded with a meg bushing to the equipment grounding conductor! I disagree.
please advise!!
having a bad day cant find code reference!!
thanks
Mike
i have an outdoor subpanel feeding a submersible pump, the raceway leaving the subpanel is 1" schedule 40 pvc which stops at a pvc pullbox then continues from there to the pump in 1" IMC my coworker says the imc does not have to be bonded with a meg bushing to the equipment grounding conductor! I disagree.
please advise!!
having a bad day cant find code reference!!
thanks
Mike