I understand using Table 250-122 in selecting the minimum size equipment grounding conductor based on the size of the OCPD. But when it is required to bond a steel structure such as a steel vessel (with no electrical devices on it) how would you select the proper size bonding jumper? In the industrial plant where I work we have an underground grid system which we tie into.