KentAT
Senior Member
- Location
- Northeastern PA
How are boundary seals accomplished when Class 1 Div 1 heat trace cable is brought into a Div 1 building? The heat trace we use has specific instructions on stripping and separating as it goes through a seal to be terminated at the thermostat or heater.
Is it necessary to also do the same as the trace goes across a Div 1/Div 2 boundary, such as through the exterior wall of a Div 1 building?
Is it necessary to also do the same as the trace goes across a Div 1/Div 2 boundary, such as through the exterior wall of a Div 1 building?