DonaldSparkyDog
Member
If a 3 wire type TC cable is run to a sample shack at a pipeline pumping station and the owner wants to utilize one phase and the neutral for 120 volt 2 amps and the other phase plus the first phase for 240 volt 15 amps and then feed them from a 2 pole 20 amp CB is there a code violation here or is it a tap?