In an apartment building there is a 70A, three-phase, four-wire feeder that runs up the building and the load centers in the apartments are fed from this feeder w/ single-phase feeders alternating among the phases. Load centers were rated 100A, single-phase. As this is an existing building I could not see the feeders sizes. Assuming the load centers are fed with a minimum of 70A wire, does each load center require a main circuit breaker? the apt building has under 24Hr maintance.