Situation-
A tanning bed fed via a 3pole 80amp breaker off a 120/208 service
Above the t-bar is a 12X12 with three transformers hanging off of it -http://ecatalog.squared.com/pubs/Electrical%20Distribution/Low%20Voltage%20Transformers/Buck%20and%20Boost/3616.pdf
They have 246 Volts at the bed but they want 236 Volts ideally.
It seems to me that the service feeders went straight through the 12x12 and then three wires came back up to to boost transformer set up.
Not having seen this kind of set up for a very long time and then when I did, in a school setting, could someone point to some stuff I could read up about this stuff on?
From what I can gather this is considered a closed delta system as there is no neutral point in it whatsoever. It seems like this is the least favorite wiring method of them so would it be prudent to rewire down to a two transformer system?
A tanning bed fed via a 3pole 80amp breaker off a 120/208 service
Above the t-bar is a 12X12 with three transformers hanging off of it -http://ecatalog.squared.com/pubs/Electrical%20Distribution/Low%20Voltage%20Transformers/Buck%20and%20Boost/3616.pdf
They have 246 Volts at the bed but they want 236 Volts ideally.
It seems to me that the service feeders went straight through the 12x12 and then three wires came back up to to boost transformer set up.
Not having seen this kind of set up for a very long time and then when I did, in a school setting, could someone point to some stuff I could read up about this stuff on?
From what I can gather this is considered a closed delta system as there is no neutral point in it whatsoever. It seems like this is the least favorite wiring method of them so would it be prudent to rewire down to a two transformer system?