I am currently in the electrical design process of a 40 story structure in AC New Jersey and I was informed by the structural engineer that throughout the 2 year construction process the building is expected to settle approximately 4 to 5 inches.
The 25kv RGS service conduits will be installed within the slab foundation shortly. Is anyone familiar with any installation practices or products which can be used between the conduits entering the building and the manhole to account for vertical settlement?