I have a manufacturer asking me to bond a drive cabinet to building steel and essentially the GE system. This is a new one for me so I'm wondering how common it is. I've driven ground rods for plenty of similar equipment but never this. My question is what the added benefit would be and also how to logically size the bond since there is no specification for that part. It's fed from a 400 amp breaker so my first thought is to simply pipe up to the closet I beam and run a #3.