Hard short the far end and feed it with a Lincoln stick welder's output.EEC said:After testing 480V Bus Duct failed due to moisture in bus duct. What are some methods used to dry already installed duct out?
EEC said:After testing 480V Bus Duct failed due to moisture in bus duct. What are some methods used to dry already installed duct out?
