The one-line shows feeders tag( 5 sets conduits) to be run from the main swbd MS-A to new 1600a switch and then to SWBD-A-B1 but the floor plan makes it look like the switch and gear are going to be set right against each other and bus tied. I assume those could be the two scenarios...?? Would they really "nipple" 5 sets if they decided to put this equipment right next to each other?