Good day fellow Electrician's,
I was seeing if someone could shied some light on my issue, please.. I work at chemical factories.. We have conduit leveeing a C1, D2 ( Class 1 , Division 2 ) area with a Seal-off before going into ground ( We do have installed ) ...Do I need another Seal-off at the point it enters the GP ( general Purpose Area ) ..? All area EX fittings ( Explosion Proof ) What are the classifications, when the conduit enters the ground, does it still require the 10' rule under ground..? Does it need another Seal-off after leveeing the classified area & surfacing into the GP area..? I have looked in Section 500 in the great book, but I just don't see it in plane English / Black & White understandable ( for me ,LoL ) ..Thank you .
I was seeing if someone could shied some light on my issue, please.. I work at chemical factories.. We have conduit leveeing a C1, D2 ( Class 1 , Division 2 ) area with a Seal-off before going into ground ( We do have installed ) ...Do I need another Seal-off at the point it enters the GP ( general Purpose Area ) ..? All area EX fittings ( Explosion Proof ) What are the classifications, when the conduit enters the ground, does it still require the 10' rule under ground..? Does it need another Seal-off after leveeing the classified area & surfacing into the GP area..? I have looked in Section 500 in the great book, but I just don't see it in plane English / Black & White understandable ( for me ,LoL ) ..Thank you .