kaiser
Member
- Location
- los angeles, ca. USA
Hello, I am about to bid a job that is a C2D1 food processing plant. With two grain silos and multiple buildings. We will be removing all interior light fixtures and replacing them with new LED fixtures. Am I suppose to use only hand tools, screwdrivers, channel locks, etc..., or is there battery drills, or pneumatic (air) tools that can be used to expedite the job?