Saubin23
New User
- Location
- New Hampshire
- Occupation
- Master Electrician
Am I required to have a boundary seal if I am running MC-HL from a Class 1 Div. 2 location through a wall into a adjacent room which is unclassified. At which point I’ll be entering my distribution panel. The cables are passing through a roxtec wall seal.
Thanks!
Thanks!