A remote I/O termination cabinet located in a Class 1 Div 2 location. The cabinet has a Z purge(N2) on it with conduit seal at the termination cabinet. My question is:
Would the outer jacket of a twisted pair shield instrument cable be required to be removed to pour the seal?