Hi All, Glad to be on board!
I am trying to Calculate a Primary URD conductor. The power utility company will not allow anything less than a 15kv #2 wire, which the load is far to big for anyway im sure.
It's a 3-PH feed, right now a 300 amp load, but will go up to an 800 amp load @ 277/480 to accomodate future expansion. There is a 750 kva xfmr we will use to accomodate any load needed. The primary urd will be about 300' long.
Thanks!
-MX