I think VE shall start from some very fundamental issues from owner and engineer: what is required, what is expected, and what exists. Most time of over budget issue is because owner is expecting more and wants pay less. If the project is way over budget, the owner shall ask architect and engineer to redesign the project, maybe down size the building, or down grade all material especially those fancy architectural stuff.
I think you can provide some recommendations to GC for bidding the job. But any recommendation relating to design change shall be approved by engineer who has stamped drawing when you start the construction.