Calrissian45
Member
- Location
- Southern California
- Occupation
- Electrical Engineer
The customer suggested providing manholes where splices will be required even though they currently have splices in hand holes. This is for a 12kV single phase system so there will only be two 1/0 cables spliced and a manhole seems like overkill to me.
I'm just a dumb engineer, though, so I'm curious if there's an installation best practice that I'm not aware of.
I'm just a dumb engineer, though, so I'm curious if there's an installation best practice that I'm not aware of.