I lost my op so i 'll try it again . Came across a 500a cb in a mcc feeding a vfd and a soft starter. Wiring left the mcc on the ground [ 2" cement pad] to the vfd/ss then to two100hp. Wires are covered up with a metal cover bolted to the wall. I asked the guy who i was working with who is my boss on this job and did not get a good answer.
I am wondering how work got by and approved. Could this pass an electrical inspection ?
about 25' between mcc and vfd / ss
I am wondering how work got by and approved. Could this pass an electrical inspection ?
about 25' between mcc and vfd / ss