I doubt that there would be much need for such an odd selection of voltages.
3 phase 4 wire at 120/208 volts is in very common use in the USA.
In larger facilities it is common to use 3 phase, 4 wire at 277/480, with transformers to feed any 120 volt load.
575 volts could be produced from either of the above by a suitable transformer, and this might be done in special cases but would not be the norm.
575 volts could also be obtained from the MV utility system by a suitable transformer, but the transformer would probably be a special, at least in the USA.